Hydro Excavation Cost Calculator

Hydro Excavation Cost Calculator

Total Materials Cost: £${materialsCost.toFixed(2)}

Total Other Costs: £${otherCosts.toFixed(2)}


Total Cost: £${totalCost.toFixed(2)}

`; }
Volume Excavated (Cubic Meters)Cost Range (£)
Up to 50£500 – £2,000
50 – 100£1,500 – £3,500
100 – 200£3,000 – £6,000
200 – 500£5,000 – £12,000
500 – 1000£10,000 – £20,000
Over 1000Contact for quote

FAQs


How do you calculate excavation cost?

Excavation cost can be calculated by determining the volume of material to be excavated (in cubic meters), multiplying it by the unit cost per cubic meter, and adding any additional costs such as labor, equipment, and disposal fees.

How much does excavation cost per cubic meter UK?
Excavation costs in the UK can vary widely depending on factors such as location, soil conditions, and project complexity. On average, excavation costs per cubic meter in the UK range from £50 to £150.

How much does excavation cost per cubic meter?
Excavation costs per cubic meter can vary depending on factors such as location, soil conditions, and project requirements. On average, excavation costs per cubic meter range from $50 to $200 in the United States.

How much does a Hydrovac truck cost?
The cost of a Hydrovac truck varies depending on factors such as brand, size, features, and condition. On average, a new Hydrovac truck can cost between $200,000 to $500,000, while used ones may range from $50,000 to $200,000.

What is the formula for excavation?
The formula for excavation involves calculating the volume of material to be excavated using the formula: Volume = Length × Width × Depth.

How much does it cost to excavate land UK?
The cost to excavate land in the UK depends on various factors such as the size of the land, soil conditions, accessibility, and any additional services required. On average, excavation costs in the UK range from £50 to £150 per cubic meter.

How long does it take to excavate 1m3?
The time it takes to excavate 1 cubic meter (1m3) of material depends on factors such as the type of soil, equipment used, and site conditions. On average, it may take a few hours to excavate 1m3 of soil.

What is excavation rate?
Excavation rate refers to the rate at which material can be removed from a site, typically measured in cubic meters per hour or cubic meters per day.

How do you estimate bulk excavation?
Bulk excavation can be estimated by determining the volume of material to be excavated and multiplying it by the unit cost per cubic meter. Additional costs such as labor, equipment, and disposal fees should also be considered.

How do you calculate soil removal?
Soil removal can be calculated by determining the volume of soil to be removed (in cubic meters) and multiplying it by the unit cost per cubic meter. Additional costs such as transportation and disposal fees should also be considered.

How do you calculate excavation and backfill?
Excavation and backfill can be calculated separately by determining the volume of material to be excavated and the volume of material to be backfilled. The costs for excavation and backfill can then be calculated based on the respective volumes and unit costs per cubic meter.

How much does it cost to get rid of a ton of soil?
The cost to get rid of a ton of soil can vary depending on factors such as location, disposal method, and local regulations. On average, it may cost between $20 to $100 per ton for soil disposal.

What is the difference between hydrovac and excavating?
Hydrovac excavation uses pressurized water and a vacuum system to loosen and remove soil, while traditional excavating involves the use of mechanical equipment such as excavators or backhoes to dig and remove soil.

How deep can you Hydrovac?
Hydrovac excavation can typically reach depths of up to 30 feet or more, depending on the specific equipment and soil conditions.

Can you Hydrovac in winter?
Yes, Hydrovac excavation can be performed in winter, but precautions should be taken to prevent freezing of water lines and equipment. Specialized equipment and procedures may be required for cold weather conditions.

What is the excavation rule of 5?
The excavation rule of 5 is a guideline used in construction to ensure safety during excavation work. It states that for every 1 foot of depth, the excavation must be set back at least 5 feet from the edge.

What are the 4 Ps of excavation?
The 4 Ps of excavation refer to Planning, Preparation, Performance, and Post-excavation evaluation. These are essential steps in ensuring safe and efficient excavation work.

What is the rule for excavation?
The rule for excavation involves following safety guidelines and regulations, such as OSHA’s excavation and trenching standards, to prevent accidents and ensure worker safety.

How much does it cost to operate an excavator per hour?
The cost to operate an excavator per hour varies depending on factors such as fuel consumption, maintenance costs, operator wages, and rental fees. On average, it may cost between $100 to $250 per hour to operate an excavator.

Can you dig on your own property UK?
In the UK, you generally have the right to dig on your own property, but you may need to obtain planning permission or comply with local regulations depending on the nature and scope of the excavation.

How much does land cost per square meter UK?
Land costs per square meter in the UK vary depending on factors such as location, zoning, and land use. On average, land costs in the UK can range from £50 to £200 per square meter.

How much can be excavated in a day?
The amount that can be excavated in a day depends on factors such as soil conditions, equipment efficiency, and labor availability. On average, a small excavator may excavate 50 to 100 cubic meters per day, while larger equipment can excavate several hundred cubic meters per day.

How much will 1 cubic metre cover?
The coverage area of 1 cubic meter of material depends on factors such as the depth of coverage and the density of the material. For example, 1 cubic meter of soil may cover an area of 10 to 20 square meters at a depth of 0.05 to 0.1 meters.

How many wheelbarrows of concrete are in a meter?
The number of wheelbarrows of concrete in 1 cubic meter depends on the size of the wheelbarrow and the consistency of the concrete mix. On average, it may take 6 to 8 wheelbarrows to transport 1 cubic meter of concrete.

How do you calculate earthwork excavation?
Earthwork excavation can be calculated by determining the volume of material to be excavated (in cubic meters) using the formula: Volume = Length × Width × Depth.

What is the most efficient excavation?
The most efficient excavation method depends on factors such as soil conditions, project requirements, and available equipment. Methods such as Hydrovac excavation and mechanical excavation are commonly used for efficient and safe excavation work.

How do you calculate excavation filling?
Excavation filling can be calculated by determining the volume of material to be backfilled (in cubic meters) and multiplying it by the unit cost per cubic meter. Additional costs such as labor, equipment, and compaction should also be considered.

How do you calculate average excavation depth?
Average excavation depth can be calculated by dividing the total volume of material excavated by the area of the excavation site. This provides an average depth value for the excavation.

What is the weight of excavated soil per m3?
The weight of excavated soil per cubic meter depends on factors such as soil type, moisture content, and compaction. On average, soil may weigh between 1.2 to 1.7 tonnes per cubic meter.

What is a bulk excavation?
Bulk excavation refers to the removal of large volumes of soil or material from a site to prepare it for construction or development.

How many tonnes is a cubic meter of soil?
The weight of a cubic meter of soil depends on factors such as soil type, moisture content, and compaction. On average, soil may weigh between 1.2 to 1.7 tonnes per cubic meter.

How do you remove a lot of soil?
Large volumes of soil can be removed using excavation equipment such as excavators, backhoes, or dump trucks. Specialized methods such as Hydrovac excavation may also be used for precise and efficient soil removal.

What is the soil removed from an excavation called?
The soil removed from an excavation is typically referred to as spoils or excavated material.

What is the bulking factor important in calculating excavation costs?
The bulking factor is important in calculating excavation costs as it accounts for the increase in volume that occurs when soil is excavated and loosened. This increase in volume affects transportation, disposal, and backfilling costs.

What is the difference between backfill and excavation?
Excavation refers to the process of digging and removing soil or material from a site, while backfilling involves filling the excavated area with soil or material to restore the site to its original condition.

How much does it cost to backfill?
The cost to backfill depends on factors such as the volume of material needed, transportation costs, and labor expenses. On average, it may cost between $20 to $50 per cubic meter to backfill a site.